Facility Expansion
Heyden is embarking on capcity ...
Our jetty in Ijora which is at the end of the channel about 300 meters from NOJ, this jetty that serves only us is 180 meters in length and is been currently dredged to 10.5 meters draft. .... MORE
Our jetty in Ijora which is at the end of the channel about 300 meters from NOJ, this jetty that serves only us is 180 meters in length and is been currently dredged to 10.5 meters draft.

Our total holding capacity is 46,000MT but considering that our property is over 65,000 square meters we are expanding our capacity in the medium term (3 months) to 70,000MT for PMS, AGO and Kero and building 2 Nos Jet Fuel storage tanks of 15,000MT capacity with a separate loading gantry. We currently have the ability to load 5,000MT in one day.

As a compliment, we have a trailer park that can accommodate between 300 400 tanker/trailers at any point in time. All these enable us to operate efficiently without unnecessary demurrages.

 
  Copyright © 2011 HEYDEN PETROLEUM LIMITED . All Right Reserved.